header transportation

Please be advised the Flagler Memorial Bridge will have a revised opening schedule for marine traffic for the Palm Beach International Boat Show.

The Flagler Memorial Bridge will open for marine traffic twice an hour at 15 minutes past the hour and 45 minutes past the hour between 8 a.m. and 7 p.m. from Wednesday, March 15, to Wednesday, March 22, and from Monday, March 27, to Tuesday, March 28. These openings for incoming and outgoing boats will last approximately 10 minutes. During presidential visits, there will be one opening an hour between 2 p.m. and 6 p.m. at 15 minutes past the hour.

The Palm Beach International Boat Show will occur from March 23-26.

The Flagler Memorial Bridge Replacement Project includes replacing the existing bascule (draw) bridge with a new bascule bridge connecting the Town of Palm Beach and the City of West Palm Beach over the Lake Worth Lagoon and the Intracoastal Waterway (ICWW). The Flagler Drive overpass is being replaced with an “at-grade” intersection. New lighting, pedestrian features, traffic signals, drainage, and landscaping are also included. Active construction began on Sept. 10, 2012, and will last until spring 2017. The estimated construction cost is $106 million.

For more information about the Flagler Memorial Bridge Replacement Project, call Public Information Officer Angel Gardner at (561) 702-9096 or email her at This email address is being protected from spambots. You need JavaScript enabled to view it.. Information can also be found on the project website:www.flaglerbridge.com

Flagler Bridge Traffic Alert